construction of the 220kv line between pomorzany and the krajnik–glinki connection jointly with extension of the 110kv pomorzany substation with a 220kv switchgear, poland
the project was signed on january 21th, 2014. this project is located in szczecin voivodeship, northwest of poland. it is a key for the poland - germany power grid interconnection. the project includes a new 220kv gis substation, extension of a 110kv gis bay and a 6 kilometers 220kv double-circuit transmission line. the gis designed and manufactured by pinggao group independently was used in this project.